The platform

A controlled spine from the field to the source of truth

Each module does one job well — and together they guarantee that every survey is captured offline, evidenced, reviewed and reconciled before it ever touches the live record.

app.clearviewams.com/overview
Asset overview

Surveys accepted

1,284+12.4%

Decent Homes compliant

94.2%+1.8%

HHSRS Cat 1 open

7−3

Awaiting QA

231.2d avg

Surveys synced

7,940 9.1%
JanFebMarAprMayJunJulAugSepOctNovDec
01

Assign

02

Pre-load

03

Capture offline

04

Sync

05

QA gate

06

Output

Available today

The survey-to-output spine, in seven modules

Live and demoable now — each module does one job well, and together they guarantee every survey is captured offline, evidenced, reviewed and reconciled before it touches the live record.

01

Offline survey capture

A template-driven survey engine that runs fully offline. Conditional routing, count-driven components, required-vs-observed prompts and submit-time validation.

  • Versioned question sets — swap the JSON to run gas, EICR, FRA or damp inspections
  • Counts drive child records (Bathrooms = 2 → Bathroom 1 & 2, automatically)
  • Required-vs-observed logic raises a pre-filled issue in one tap
  • Submit-time validation blocks incomplete or invalid surveys before QA
9:41
All surveys

12 Vicarage Lane

Services & safety

5/8

Boiler / heating condition

Fair

Electrical installation condition

Good

CO alarm fitted & working

Required where combustion appliances are present.

CO alarm missing or not working Raise issue

Smoke alarm fitted & working

Fire door self-closer functioning

BackNext
02

Evidence & photos

Photos are bound to a specific question, component, issue or access event — never a loose gallery. Captured and uploaded timestamps, user, device and caption travel with every image.

  • Downscaled on capture, queued, and shown as pending thumbnails
  • Uploaded to secure blob storage on sync, stamped with upload time
  • Embedded in the PDF beside the record they evidence
  • Parent-linked so evidence is always traceable to its source
9:41
All surveys

12 Vicarage Lane

Kitchen

3/8

Kitchen 1

Condition

Fair

Observed remaining life

6 yrs

Estimated renewal year

2031

Notes

Worktop edges swelling near sink.

1 photo · queued
BackNext
03

Poor-network sync & conflict control

A robust queue with retry and resume that drains automatically when you reconnect — with a no-silent-overwrite guarantee at its core.

  • Master-version compare blocks pushes that would overwrite changed data
  • Every conflict is logged as an auditable sync event
  • Pending and failed items surfaced to surveyors and managers
  • Sync completeness distinguishes response, photo, partial and failed
app.clearviewams.com/overview
Asset overview

Surveys accepted

1,284+12.4%

Decent Homes compliant

94.2%+1.8%

HHSRS Cat 1 open

7−3

Awaiting QA

231.2d avg

Surveys synced

7,940 9.1%
JanFebMarAprMayJunJulAugSepOctNovDec
04

HHSRS & issue-level records

A property-level HHSRS summary plus individual issue records with unique IDs. One hazard can spawn several issues, each independently tracked.

  • Category 1 / Category 2 hazards with controlled urgent-review reason codes
  • Issues link to a component instance and the question that raised them
  • Repair, HHSRS, urgent, damp/mould, access and data-quality types
  • Category roll-up on the review step and in the report
9:41
All surveys

12 Vicarage Lane

Issues & HHSRS

7/8
!HHSRS· Category 1ISS-0042

Bathroom 2 — north wall

Investigate & treat damp / mould

!Urgent review· Cat 1 concernISS-0043

Kitchen 1 — combustion

CO alarm missing — fit immediately

!RepairISS-0044

Kitchen 1 — worktop

Renew worktop run

Add issue
BackNext
05

QA & maker-checker

An explicit quality gate between field and master. Submit → review → accept or reject with comments, fully audited, with no silent overwrite of the live record.

  • Read-only QA review with HHSRS highlighted
  • Accept promotes to the export/report source; reject returns it editable
  • Every decision recorded as a QA event with attribution
  • Reusable as an assurance gate for delegated partner submissions
9:41

My Surveys

Offline

3 properties · pre-loaded for offline

12 Vicarage Lane

E15 4ES · Stratford

In progress

Flat 4, 8 Romford Road

E15 4LD · Stratford

Ready offline

27 Plashet Grove

E6 1AD · East Ham

Ready offline
06

Reports & structured outputs

A formatted PDF report and a structured, stable-key export — both generated from the same accepted data so they always reconcile.

  • Eight-table export (XLSX sheet-per-table + per-table CSV)
  • Referential joins by survey, issue, component and photo IDs
  • Power BI / data-warehouse ready, no manual interpretation
  • PDF embeds photos and the HHSRS summary per section
app.clearviewams.com/reporting
Asset overview

Surveys accepted

1,284+12.4%

Decent Homes compliant

94.2%+1.8%

HHSRS Cat 1 open

7−3

Awaiting QA

231.2d avg

Surveys synced

7,940 9.1%
JanFebMarAprMayJunJulAugSepOctNovDec
07

Access control & audit

Named-user, least-privilege roles with per-scope restriction. External surveyors see only their assigned properties; every action is attributed.

  • Five roles with per-role landing pages and route guards
  • External supplier surveyors scoped to assigned properties only
  • Offline sign-in via cached identity; SSO/MFA-ready
  • Audit trail across capture, photo, QA and sync events
app.clearviewams.com/properties/100023001
PortfolioStratfordVicarage Court12 Vicarage Lane

12 Vicarage Lane

UPRN 100023001 · P0001772001

Secure tenancy Decent · HHSRS clear

Components

5 records
Kitchen 16 yrsFair
Bathroom 19 yrsGood
Bathroom 22 yrsPoor
Boiler 15 yrsFair
Fire door 1Good
The full platform

Every requirement of a modern AMS — see it work

Mapped to the Asset Management Systems requirements (§4A–§31). One platform, one data model, every surface built out.

app.clearviewams.com/surveys/100023001
Survey · 12 Vicarage LaneStock condition · 2026

UPRN 100023001 · P0001772001

Surveyor Tomas Nowak · submitted 14 Jun 2026

Accepted

Stock intelligence

2 bed1 kitchen2 bathsMains gasDoor entryNo adaptations

Components

4 records
Kitchen 1
6 yrsFair
Bathroom 1
9 yrsGood
Bathroom 2
2 yrsPoor
Boiler 1
5 yrsFair

HHSRS issues

HHSRS · Category 1ISS-0042

Bathroom 2 — damp & mould

Urgent reviewISS-0043

Kitchen — CO alarm missing

7 photos captured · PDF & structured export reconciled

Stock condition surveys

§12–14Explore

The offline-first capture spine — photos, components and issue-level HHSRS.

Offline captureCount-driven componentsHHSRS Cat 1/2Stock intelligence
app.clearviewams.com/properties/100023001
PortfolioStratfordVicarage Court12 Vicarage Lane

12 Vicarage Lane

UPRN 100023001 · P0001772001

Secure tenancy Decent · HHSRS clear

Components

5 records
Kitchen 16 yrsFair
Bathroom 19 yrsGood
Bathroom 22 yrsPoor
Boiler 15 yrsFair
Fire door 1Good

Asset register & hierarchy

§5–7, §19Explore

A live, effective-dated register of property, block and component.

Property → block → componentLifecycle dataClassificationSnapshot vs live
app.clearviewams.com/compliance
Compliance overviewLive · all stock

Required

1,180

Externally managed

42

Pending review

7

Unknown

0

exceptions, not green

Gas safety (LGSR)

98%

Electrical (EICR)

96%

Fire risk (FRA)

91%

Asbestos re-inspection

88%

Lifts (LOLER)

100%

Water (Legionella)

94%

Evidence-led compliance

§8–11Explore

A controlled denominator and certificate drill-through — never false-green.

Applicability + evidenceCertificate storeKPI cyclesUnknown = exception
app.clearviewams.com/repairs
Repairs & investment

Open jobs

142+8

Repair spend YTD

£1.84m+4.1%

Repeat-failure flags

23+5

Planned programme

£4.2mFY25/26

High-cost & recent jobs

View all

12 Vicarage Lane

SOR-4821 · Plumbing

£2,140Completed

Flat 4, Romford Rd

repeat failure

SOR-4830 · Electrical

£3,980In progress

27 Plashet Grove

SOR-4844 · Heating

£1,260No access

Flat 11, Katherine Ct

SOR-4851 · Roofing

£5,410In progress

3 Shrewsbury Rd

repeat failure

SOR-4862 · Damp & mould

£2,675Completed

Repairs, warranty & investment

§15–17Explore

Demand and spend joined to the asset, feeding planned investment.

Repairs feed (SOR, cost)Repeat-failure flagsWarrantyLifecycle → programme
app.clearviewams.com/movement
Stock movementAs at 31 May 2026 · all stock

Monthly reconciliation

effective 31 May 2026

Opening

12,480

Additions

+42

Removals

−18

Transfers

6

Closing

12,504

RTB pipeline

24

Application

11

S125 review

7

S125 issued

5

Completed

Recent movements

Flat 6, Maryland Point

E15 1AB · New-build handover

+AcquisitionApproved

14 Sebert Road

E7 0NQ · RTB completion

DisposalApproved

Flat 2, Carpenters Estate

E15 2DZ · Management → TMO

TransferPending

9 Henniker Road

E15 1JY · Demolition programme

DisposalPending

Stock movement, tenure & leasehold

§18, §20–21Explore

Effective-dated movement, the RTB pipeline and leasehold obligations.

Monthly reconciliationRTB & Section 125Section 20 rechargeProgramme impact
app.clearviewams.com/assurance
Delegated assurance3 partners · 2,370 units

Managed stock by partner

PFI – Lansbury

1,240

unitsAssured

TMO – Carpenters

820

unitsPending

Managing agent – East Ham

310

unitsAssured

Submissions awaiting assurance

Lansbury PFI

Gas · submitted 16 Jun

Accept Reject

Carpenters TMO

EICR · submitted 15 Jun

Accept Reject

Carpenters TMO

FRA · submitted 14 Jun

Accept Reject

East Ham MA

Damp · submitted 12 Jun

Accept Reject
CRM / Northgate sync · last 14:202 conflicts flagged

Delegated management & integrations

§22–23Explore

Restricted partner environments with landlord assurance, and governed contacts.

RBAC by portfolioPartner evidenceAccept/reject assuranceCRM / Northgate sync
app.clearviewams.com/strategy

Strategy & risk

Portfolio · 64 dwellings
Void turnaround
6
Keys
avg 2d
4
Inspection
avg 4d
9
Works
avg 11d
3
Compliance
avg 6d
5
Ready-to-let
avg 3d
Retrofit · EPC bands
A
2
B
9
C
31
D
22
E
7
F
2
G
1
Resident risk
NPV option-appraisal data: ready
14
Disrepair
9
Complaints
2
Ombudsman
31
Damp & mould

Strategy, sustainability & risk

§24–25, §30–31Explore

Net-zero readiness, void turnaround, disrepair risk and NPV-grade data.

Void turnaroundEPC / retrofitDisrepair & OmbudsmanNPV readiness
app.clearviewams.com/reporting
Asset overview

Surveys accepted

1,284+12.4%

Decent Homes compliant

94.2%+1.8%

HHSRS Cat 1 open

7−3

Awaiting QA

231.2d avg

Surveys synced

7,940 9.1%
JanFebMarAprMayJunJulAugSepOctNovDec

Data, governance & reporting

§4A, §26–29Explore

A single source of truth with audit, maker-checker control and day-one reporting.

Named-user RBAC + auditNo silent overwriteStable-key BI feedsSaved views
How we compare

What legacy asset management platforms don't do

The capabilities that decide whether field data is trustworthy — and where most platforms quietly fall short.

CapabilityClearView AMSUsLegacy housing AMSGeneric CMMS / inspection apps
Full offline field capture (no signal)
Survives app restart on-device
No-silent-overwrite conflict control
PDF + structured export from one source
Issue-level HHSRS (Cat 1/2, reason codes)
QA accept/reject gate before live update
Named-user audit on every action
Template engine for any inspection type
Evidence-led compliance denominator
Installable PWA — no app store
Full supportPartial / add-onNot supported

Want the deep dive?

We'll walk your team through the spine end-to-end on a real batch of your stock.